• YOUR ARE HERE :
  • HOME
  • APPLICATION SUBMISSION GUIDELINES
  • APPLICATION SUBMISSION DETAILS

Application
Submission Details

Empowering Carbon Neutrality

Award Category
Details to be included in the submission
No. of Awards
Intended Applicants

Energy Efficiency -
Public Sector

  • Achievements accomplished in implementing effective measures in rationalization of power, water, and transportation fuel (i.e., electric and hybrid vehicles).
  • Applicant shall demonstrate results to reduced energy consumption such as saving in water, electricity, fuel, chemicals and/or other resources.
1 No. each for Golden, Silver & Bronze
Government owned organizations (government stake represents the higher share).

Energy Efficiency -
Private Sector

  • Achievements accomplished in implementing effective measures in rationalization of power, water, and transportation fuel (i.e., electric and hybrid vehicles).
  • Applicant shall demonstrate results to reduced energy consumption such as saving in water, electricity, fuel, chemicals and/or other resources.
1 No. each for Golden, Silver & Bronze
Privately owned organizations (including entities with government stakes representing the lower share).

Large Energy
Project

  • Executed project (above USD 3.0 Million in total Capex) intended to enhance energy management through conservation, optimization or retrofitting to achieve planned and measurable objectives and targets. This includes clean energy, water supply and treatment, renewable energy, financial mechanism, and policy development.
  • The applicant shall demonstrate the executed project, technology, or methodology in delivering proven results.
1 No. each for Golden, Silver & Bronze
Private, semi-government and government organization

Small Energy
Project

  • Executed project (below USD 3.0 Million in total Capex) intended to enhance energy management through conservation, optimization or retrofitting to achieve planned and measurable objectives and targets. This includes clean energy, water supply and treatment, renewable energy, financial mechanism, and policy development.
  • Applicant shall demonstrate the employed project, technology, or methodology in delivering proven results.
1 No. each for Golden, Silver & Bronze
Private, semi-government and government organizations.

Circular
Economy

  • Executed methodology which delivered a regenerative process to optimize resources and energy management applications. The process or project shall demonstrate that products or materials were designed, recovered, and re-used to extend their usage and economic value. This includes developed technology and product in the fields of clean energy, material manufacturing, water supply, water treatment, waste management, energy optimization, rationalization of water and electricity consumption, reduction of carbon footprint and relevant circularity disciplines.
1 No. each for Golden, Silver & Bronze
Private, semi-government and government organizations.

Distributed Solar
Generation
(Large Scale ≥ 500kW)

  • Executed solar installations capacity equal to/or greater than 500kW.
  • Applications in industrial, commercial, public & gov. buildings/facilities and residential buildings.
  • Installations must be operational for a minimum period of 6 months and demonstrate continuous operation.
  • Evaluation shall merit additional points for integrating storage capacity within the same location/facility.
  • The added value of solar element in solving energy access challenges shall merit additional points in evaluation (e.g., Impact on community, neighborhood, particularly in areas where energy is scarce).
  • Level of innovation in integrating solar energy within the building/facility structure (PV glass, Building-integrated photovoltaics (BIPV).
  • Implementation of innovative financing schemes.
  • Application of solar energy in productive uses other than power generation.
  • Installation which provides net-zero energy for building energy requirement shall merit increased points in the scoring.
1 No. each for Golden, Silver & Bronze
Private, semi-government and government organizations.

Distributed Solar
Generation
(Small Scale < 500kW)

  • Executed solar installations capacity of less than 500kW.
  • Applications in industrial, commercial, public & gov. buildings/facilities and residential buildings.
  • Installations must be operational for a minimum period of 6 months and demonstrate continuous operation.
  • Evaluation shall merit additional points for integrating storage capacity within the same location/facility.
1 No. each for Golden, Silver & Bronze
Private, semi-government and government organizations.